Power Grid: Québec/Baden-Württemberg
How do you play Power Grid: Québec/Baden-Württemberg?
The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.
To find the best price for Power Grid: Québec/Baden-Württemberg, howtoplay.ro compares deals from Romanian shops every day.
%2Fpic1279517.jpg)
The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.
In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.
In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins.
Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.
Incorporates maps from:
Mégawatts
Funkenschlag: EnBW
Frequently asked questions
Q1How much does Power Grid: Québec/Baden-Württemberg cost?
Q2Where can I buy Power Grid: Québec/Baden-Württemberg cheapest?
Q3How do you play Power Grid: Québec/Baden-Württemberg?
Q4How many players does Power Grid: Québec/Baden-Württemberg support?
Q5How long does a game of Power Grid: Québec/Baden-Württemberg take?
Q6What age is Power Grid: Québec/Baden-Württemberg for?
Q7How complex is Power Grid: Québec/Baden-Württemberg?
All prices
Currently unavailable in all shops
Sign in to receive restock notifications.
Price history
Price trend over the last 90 days: minimum 32 lei, maximum 39 lei, now 39 lei.